The contractor will be using a crane to set generators on the roof of Brown this Saturday morning, August 4 from approximately 7am to noon. They will set the one on the south side first. Alexander Drive will be closed from approximately 7am to 9:30am. They will then set the generator on the north side of the building. The drive on the north side will be closed from approximately 9:30am till noon.